Page 29 - Ickford NP Consultation Report
P. 29

ICKFORD NEIGHBOURHOOD PLAN CONSULTATION REPORT  :  VISION FOR ICKFORD  29



                                          19    Bridges. Roads. Buses. Parking. Drains. Flooding. This village may have
                                                space for homes but no roads, recreational space. Our children need
                                                green space for healthy life not more pollution and buildings.
                                                STRONGLY OPPOSE– KEEP OUR VILLAGE!
                                          20    Improved bus service, widening and resurfacing of roads towards
                                                Thame, Tiddington. New and improved footpaths, cycle routes –
                                                these to be kept clear and not overgrown.
                                          21    If Turnfields goes ahead traffic management must be improved and
                                                issues over surface water.
                                          22    Improve quality of roads in, through and out of the village. Sufficient
                                                parking in the development to prevent parking on road verges.
                                                Improved drainage – scheme to slowly release water/sewerage
                                                impractical – better clearance of water needed out of the village.
                                          23    Better management of traffic through the village. Maintenance of
                                                pathways and verges.
                                          24    Surface water drainage. Upgrade the sewerage system to prevent
                                                overflows of raw effluent into the roads and streams.
                                          25    Drainage. Sewerage. Power supply. Roads.
                                          26    Sewerage system. Surface water drainage. Road conditions.
                                          27    Foul drainage capacity improved. School size. Improve surface water
                                                drainage. Review of twin bridges road.
                                          28    New drainage system. Better parking arrangements around the school
                                                and village shop. Better signage and restrictions for heavy vehicles
                                                using bridges.
                                          29    Better public transport/nature reserve.
                                          30    More off road parking especially for school drop-off and pick up on
                                                Sheldon Road.
                                          31    A bypass around the village.
                                          32    Better, more professionally run shop with a wider range of goods and
                                                longer opening hours. Fewer children brought into the village to
                                                school from outlying area by car each day. Too many cars parked by
                                                the school.
                                          33    The village could probably cope with development of Turnfields,
                                                depending on extra resources for the school and a better bus service.
                                                The other sites would require major extra resources for the school
                                                and shop which would be unlikely to ever happen.
                                          34    Turnfields and 42 Worminghall Road developments will increase
                                                traffic into and around the area – another access in would affect less
                                                people. No matter what happens now, within the next 10 years we
                                                will need more housing – so it would be better to look long term
                                                NOW. The easy development is Turnfields, but once this has been
                                                accepted, then all the fields North of it (i.e. Pound Ground and
                                                Worminghall Road) will likely gain permission. Why not make the
                                                developers put any access in from the main Ickford Road which will
                                                have less of a traffic impact on the village? Once the Turnfields
                                                development goes ahead, all the extra traffic will then have to come
                                                through the village.
                                          35    Ditches to be cleared out






                                         VISION FOR ICKFORD – NEIGHBOURHOOD DEVELOPMENT PLAN
                                                   www.visionforickford.co.uk
   24   25   26   27   28   29   30   31   32   33   34