               104    I don’t want to see the proposed housing developments going ahead.
                      We need a lot more time to discuss this. It has been rushed through
                      and the questions about why that happened need to be discussed
                      before any decision is made about housing developments in our
                      village.
               105    Ensuring adequate parking, particularly for school.  This would help
                      with extra traffic through the village. If the school development goes
                      ahead, this will lead to extra staff and more cars. The car park cannot
                      cope now. When the carpark was built at the same time as the pre
                      school building, two spaces in the car park were allocated for pre
                      school workers, that does not happen now and during the day, it is
                      gridlock with parked cars on the road, they need to make provision
                      for staff and visitor parking during the day now and in the future.
               106    Maintained roads. New pumping stations for the sewers.
               107    None.
               108    Mains gas. Turnfields will become dangerous if it is the only access
                      road to any developments at the end of the road. The sewerage
                      already struggles to cope with the existing houses. Any additional
                      houses would affect the pipework further.
               109    Upgrading of the drainage system, resurfacing of roads.
               110    Thames Water to sort out flooding.
               111    Upgrade to drainage and sewerage.
               112    Sewage needs to be upgraded.
               113    Upgrade of current sewage and foul water drainage. Implementation
                      of flood prevention measures. Improvement to road system (already
                      dangerous around Sheldon and Bridge Roads at peak school times).
                      School would need to increase in size (planning permission already
                      requested for 3 additional class rooms).
               114    I just hope one of the developers will aid us in solving the surface
                      water issues.
               115    Road improvement. Flooding issues . The developer to help with cost
                      of improvements needed for the village.
               116    Uprated utilities – all of them – considerable improvement to dealing
                      with waste water especially for Church Road, Sheldon Road corner if 155
                      new homes are approved – all new large scale sites required to install grey
                      water systems – broadband maybe BT need to get their act together and
                      upgrade.
               117    SEE AS ABOVE. IMPROVED PARKING FOR SCHOOL
                      ACTIVITIES INCLUDING CHILDREN PARENTS DROP-OFF AND
                      COLLECTING POINTS.
               118    Replacement of sewerage system. Overhaul and improvement of
                      drainage system.
               119    Car park for all school traffic.
               120    Access from Shabbington Road rather than close to the village. Buffer
                      zone with landscaping behind Worminghall Road properties so the
                      development does not impinge as much on views from back gardens.
                      No streetlights.








                                                VISION FOR ICKFORD – NEIGHBOURHOOD DEVELOPMENT PLAN